Phase 1 Expansion
A bigger, better equipped perioperative suite
Expansion to the third floor of Jim Pattison Pavilion North at VGH will benefit patients, physicians and staff in the following – and many other – ways.
16 larger, universally sized ORs with standardized layout to provide maximum flexibility meeting current CSA standards, including infection control. |
ORs with integrated state-of-the-art technology and equipment, including educational connectivity. |
40-bed consolidated pre- and post-op unit to improve the continuity of patient care and reduce OR holds. |
Pre-op anesthesia intervention bays to ensure sufficient time and space for anaesthesia procedures. |
Updated and enhanced plumbing, electrical and HVAC to maintain safety and to support new equipment and technologies. |
A new elevator dedicated to JPP 2 and 3 to support patient movement. |
Smaller, easier to access sterile cores, each supporting a pod of 8 ORs to minimize travel time and enable just-in-time stocking. Additional and larger storage spaces in the clean corridors. |
Appropriately sized and configured work spaces for Anaesthesia, Perfusion, Medical Imaging, Housekeeping and other services. |
A new staff lounge and enhanced locker space. |